Location & Description of Work |
FOUR LANING OF AHMEDNAGAR – MIRAJGAON – KARMALA – TEMBHURNI SECTION OF NH-561A [PACKAGE –II FROM DESIGN KM 38.775 (GHOGARGAON) TO DESIGN KM 80.390 (AHMEDNAGAR-SOLAPUR BORDER)] IN THE STATE OF MAHARASHTRA UNDER BHARATMALA PARIYOJANA ON HYBRID ANNUITY MODE |
Hybrid Annuity Works Package No. MU-5- Improvement to Mokhada Kasara Vashala Dolkhamb Tokawade Vaishakhare Mhasa road SH-78 Km 44/00 to 130/540 Tal-Shahapur and Murbad, Dist-Thane on Hybrid Annuity Basis. (80.35 km) |
Hybrid Annuity Works Package No. MU-4- A. Improvement to Shahapur Shenwa Dolkhamb Chondha Sangamner Shegaon Nanded Dharmabad Road SH – 50 (Km 0.00 to Km 38.000), Tal. Shahapur, Dist. Thane on Hybrid Annuity Basis. B. Improvement to Kambare Piwali NH-3 to Washind Road MDR-57, (Km 0.00 to Km 23.600), Tal. Shahapur, Dist. Thane on Hybrid Annuity Basis. |
Wall to Wall Grading of Operational area at Mysore Airport |
Upgradation of new NH-341 to two-lane with paved side shoulder configuration between design chainage from Km 65.478 to Km 162.209 including geometric improvement and reconstruction of old/weak structures. (Bhuj Airport Jn.-Khavada – India bridge to Dharmshala section) in the State of Gujarat on EPC Mode |
Construction of civil works up to formation including Earthwork, blanketing, minor bridges, retaining walls, drains, ground improvement works, relocation of existing roads etc. from Chainage 37+532 (IR 196/15-17) to Chainage 57+800 (IR 216/23-25) in connection with construction of Western dedicated freight Corridor phase- II Vaitarna-Sachin Section. Infra Work Package SS4-A |