Current Project

Location & Description of Work
FOUR LANING OF AHMEDNAGAR – MIRAJGAON – KARMALA – TEMBHURNI SECTION OF NH-561A [PACKAGE –II FROM DESIGN KM 38.775 (GHOGARGAON) TO DESIGN KM 80.390 (AHMEDNAGAR-SOLAPUR BORDER)] IN THE STATE OF MAHARASHTRA UNDER BHARATMALA PARIYOJANA ON HYBRID ANNUITY MODE
Hybrid Annuity Works Package No. MU-5- Improvement to Mokhada Kasara Vashala Dolkhamb Tokawade Vaishakhare Mhasa road SH-78 Km 44/00 to 130/540 Tal-Shahapur and Murbad, Dist-Thane on Hybrid Annuity Basis. (80.35 km)
Hybrid Annuity Works Package No. MU-4- A. Improvement to Shahapur Shenwa Dolkhamb Chondha Sangamner Shegaon Nanded Dharmabad Road SH – 50 (Km 0.00 to Km 38.000), Tal. Shahapur, Dist. Thane on Hybrid Annuity Basis. B. Improvement to Kambare Piwali NH-3 to Washind Road MDR-57, (Km 0.00 to Km 23.600), Tal. Shahapur, Dist. Thane on Hybrid Annuity Basis.
Wall to Wall Grading of Operational area at Mysore Airport
Upgradation of new NH-341 to two-lane with paved side shoulder configuration between design chainage from Km 65.478 to Km 162.209 including geometric improvement and reconstruction of old/weak structures. (Bhuj Airport Jn.-Khavada – India bridge to Dharmshala section) in the State of Gujarat on EPC Mode
Construction of civil works up to formation including Earthwork, blanketing, minor bridges, retaining walls, drains, ground improvement works, relocation of existing roads etc. from Chainage 37+532 (IR 196/15-17) to Chainage 57+800 (IR 216/23-25) in connection with construction of Western dedicated freight Corridor phase- II Vaitarna-Sachin Section. Infra Work Package SS4-A